The TOB3 international project with France, Spain, Italy and Belgium has come to an end. I remember with nostalgia the meetings in Paris, Besancon Valencia, Rende, UNICAL with many friends and with Domenico Grimaldi who will always remain in our
Experimenting with the integration of circularity concepts in architecture thanks to BIM
At EduBIM 2020, Charlotte DAUTREMONT, doctoral student architect and Sylvie JANCART, professor-director of laboratory shared an experimentation of a new BIM learning model.
Multidisciplinarity in architectural design
At SCAN 2020, Charlotte DAUTREMONT presented the 20-year evolution of a BSolutions company. Through this company, we witness the genesis of BIM.
BIM and green building: a project that becomes reality
BIM and green building are two themes that are gaining more and more importance in the construction industry. The ToB3 project seeks to promote both these themes and above all their synergy. Combining the potential of BIM with the sustainable
Energy and Water Festival 27-28-29 March 2018
Building Smart International Certification
The Professional Certification Programme exists to support training organisations to provide internationally recognised and standardised training content. BuildingSMART, through the Professional Certification Programme: It will support the standardisation of openBIM training content.Enabling the approval of training organisationsTesting and qualifying individuals
Desecrate the BIM!
Above all, it is essential to desecrate BIM! Nothing is simpler since already informally in place since Man built. The key words being methodologies and protocols. What we teach to any Tradesman during their apprenticeship. The invention of BIM carries
BIM GAME experience
The BIM Game was born as a challenge against time in the name of the quality of architectural design and digitized design processes, in line with the specific national and international directives on BIM. A challenge that is another great
The Italian education and training system related to BIM
The BIM is compulsory in Italy from January 2019 for public contracts with an amount equal to or higher than 100 million euros; it will be compulsory until 2025, when all public works will necessarily have to be managed according
BIM & Facility Management
The Maintenance and Operation and Maintenance phase of a property represents a very long time span with high operating costs, even higher than those faced during the design and construction phase. The problems encountered during this phase are of different